What information do you need to quote a machined part?
A 2D drawing or 3D model, material grade, critical tolerances, surface finish, quantity and required date. Without material and finish the quote is only an estimate.
How long does quoting take?
Typically one to two working days for a complete RFQ; parts with several operations take longer because the process route has to be estimated.
Do you provide material certificates?
Mill certificates or material test reports ship with production lots when requested on the purchase order.
Can you hold a tolerance of +/-0.005 mm?
That level requires grinding or hard turning and must be marked on the drawing, because it changes the process route and the price.
What is the minimum order quantity?
It depends on process: turned and milled parts can run from a handful of pieces, while die casting is tooling-driven and needs volume to be economic.
Do you handle surface treatment and assembly?
Yes - anodising, plating, powder coating, passivation, heat treatment and assembly are coordinated in the same supply chain so datums and finishes stay consistent.
How is shipping handled?
Goods ship EXW, FOB or DDP depending on the agreement. For US imports, duty classification should be agreed with your customs broker before the first shipment.
Who owns tooling for castings?
Standard practice is customer-owned tooling with a written tool life and maintenance clause, agreed before the tool is built.
Can you sign an NDA before receiving drawings?
Yes. Send the NDA first and drawings afterwards; customer drawings are not circulated.
What happens if a lot fails inspection?
The measurement method and datum scheme are agreed before production, so a failure is measurable. Rework, replacement or credit is then decided against that agreement rather than against opinion.