Process guide
Die Casting - what buyers should specify
High-pressure die casting produces thin-wall aluminium, zinc and magnesium parts at volume, with machining and finishing in the same supply chain.
| Typical parts | Housings, covers, brackets, motor end caps, heat-sink bodies, connector shells, gearbox covers. |
|---|---|
| Materials | Aluminium ADC12/A380, zinc alloy No.3/No.5, magnesium AZ91D on request. |
| Tolerance reference | As-cast general tolerance +/-0.1 mm; machined features +/-0.02-0.05 mm; draft angles 1-2 degrees typical. |
| Surface finish | As-cast, shot blasting, powder coating, e-coating, chromate conversion, machining to expose datums. |
What changes the price
- Tolerance: every tightening of tolerance adds inspection and slower cutting cycles.
- Material: stainless and titanium machine 2-4x slower than aluminium and shorten tool life.
- Quantity: setup and programming are amortised over the lot; small lots carry higher unit cost.
- Drawing completeness: missing datums or undefined finishes cause rework and delay.
What to send for a quote
- 2D drawing (PDF) and 3D model (STEP/IGES) where available.
- Material grade and certificate requirement (mill cert, material test report).
- Critical dimensions and tolerances, plus which features are cosmetic.
- Surface finish and any heat treatment or passivation.
- Order quantity, expected annual volume and required delivery date.
Die casting is tooling-driven: quote depends on annual volume, part size, tool life and machining allowance. Tooling lead time is typically 4-8 weeks with sampling before mass production.
Send an RFQ
Questions buyers ask about die casting
What annual volume justifies die casting tooling?
As a rule of thumb, aluminium high-pressure die casting becomes economical above roughly 3,000-5,000 pieces per year per tool; below that, sand casting or machining from solid is usually cheaper.
Who owns the tooling?
Tooling ownership and amortisation must be stated in the contract. Standard practice is customer-owned tooling with a tool life and maintenance clause.