Guide

How to Vet a Machining Supplier Before the First Order

Price comparison is the last step, not the first. These checks catch most of the failures that surface six months into a supply relationship.

1. Entity and scope

2. Quality system

3. Capability evidence, not capability claims

4. Trial lot

Order a small production lot, not a one-off prototype. Prototypes are often made by the best machinist on the best machine; production reveals whether the process is controlled.

5. Measurement agreement

Agree in advance how disputes are measured: whose CMM, at what temperature, using which datum scheme. Most tolerance arguments are measurement arguments.

6. Commercial terms

A supplier that answers these questions in writing, quickly and specifically, is usually a supplier that will answer a quality problem the same way.